Three Roll Mill work schedule
March 15, 2023
①,After starting the operation, adjust the gap between the middle and rear rollers to 0.3 mm, press the baffle plate, add slurry appropriately, visually inspect the coloring depth, fine-tune the rear rollers so that the coloring is evenly spread over the rollers, and then lock the fixing nut.
②,Adjust the hand wheel of the front roller with both hands at the same time, so that the front roller slowly touches the middle roller and the
surface of the front roller is evenly colored, then lock the fixing nut, and then adjust the angle of the material plate so that it is properly pressed on the roller surface, and the slurry can be uniform discharge. Check the uniformity of the discharge and the particle size of the finished product, and continue to fine-tune the front and rear rollers until the particle size of the finished product reaches the predetermined requirements. The scraper should be returned in time before and after.